Cleveland Cascades has accepted an order to supply a Cascade System to Oman to load iron ore pellets.

The system will be one of Cleveland Cascades' 1700 sized Cascade Chutes and will be designed to load 5,000 tonnes per hour from a Luffing Shiploader.

The chute will be suspended from a pivoting headchute and will extend to a length of 23.58m with a retracted height of 7.8m.

The system will feature a locally mounted spool winch for vertical control along with our standard material detection, load monitoring, position sensing and travel systems for safety and automation.

For the Cascade; each of the cones will be supplied with 6mm ceramic liners and the Head chute with Chromium Carbide for abrasion resistance. The steelwork will be supplied painted for corrosion protection.

An additional feature are to be supplied with this system is a Headchute Maintenance Platform, as shown in the gallery below, to allow for routine maintenance access to the head chute area of the system.
 
  
                CC1017                                                       CC1017 Maintenance Walkway
 
  
                         CC1017 Carrier                                                  CC1017 Shroud Down
 
                                                               CC1017 GA 
 
 
For further information about the company's Cascade or conventional chutes please visit website www.clevelandcascades.co.uk or contact enquires@clevelandcascades.co.uk.