Rudowe Quay, a structure built over 80 years ago, has been demolished and replaced with a new quay that is over 250 metres long, equipped with modern hydrotechnical, railway and technical infrastructure.
Ask any bulk terminal manager how much material is inside their silos, and they’ll likely check their conveyor scale logs. The problem? Scales only measure what goes in and out — not what actually stays inside...